Changes to "Action Plan" between 2015-09-22 07:15:05 and 2015-09-22 07:16:45

    31     31       Smartphone software that allows people to propagate 
    32     32       info through an ad-hoc network, including bus drivers, who 
    33     33       drive regular routes, etc. <i>(It probably takes 3 months to complete that  step, because it assumes the use of native code and on phones the use of native code can be very problematic.)</i>
    34     34       </li>
    35     35   </ul>
    36     36   
    37     37   
    38         -The later stage, Stage_1, is about the physical drones, swapping of firmware-malware-prone-USB-sticks.
           38  +The later stage, Stage_1, is about the physical drones, swapping of firmware-malware-prone-USB-sticks, studying of various private LAN technologies, etc.