Changes To Action Plan
Not logged in

Changes to "Action Plan" between 2016-07-20 18:22:50 and 2016-07-20 18:24:30

    41     41   </div>
    42     42   
    43     43   <div><br>
    44     44   </div>
    45     45   
    46     46   <h2>Long Term Wish List</h2>
    47     47   <ul>
           48  +<li>Silktorrent tunnel that is based on the <a href="https://ipfs.io/">IPFS</a>.</li>
    48     49   <li>Write a fast, formally verified, version of the proper symmetric cropto
    49     50   algorithm, essentially the mmmv_shallowcrypt_t1. <i>(It probably takes 2 months
    50     51   to complete that step, one month for the GPU based implementation, OpenGL ES,
    51     52   and the other for the plain CPU based implementation.)</i></li>
    52     53   <li>Implement Apache Cordova based smartphone software that allows people to
    53     54   propagate info through an ad-hoc network, including bus drivers, who drive
    54     55   regular routes, etc. <i>(It probably takes 3 months to complete that step,